The Queen goes green! Old boilers are winched out of Buckingham Palace

The Queen goes green! Ageing boilers are winched out of Buckingham Palace after more than 30 years as they are replaced by a new state-of-the-art energy centre

  • New clip shows Palace replacing 30-year-old boilers with modern energy centre
  • Re-serviced basement will save Palace 300 tonnes per year in carbon emissions 
  • £370 million revamp will make Palace more eco-friendly and cost effective

Buckingham Palace is updating its decades-old water and heating systems as part of its £370 million revamp to become more cost effective and environmentally friendly.

The 10-year re-servicing programme is a vast overhaul of the Palace’s water and heating systems, which includes 30-year-old boilers and heating pipes up to 60 years old.

In a newly released clip published by the Royal Family, the video puts the Palace’s ageing basement on full display.

In a newly released clip published by the Royal Family, the video puts the Palace’s ageing basement on full display 

The 10-year re-servicing programme includes a vast overhaul of the Palace’s water and heating systems, which include 30-year-old boilers and heating pipes up to 60 years old

Project manager Bob Igoe opens by highlighting the urgency of replacing the Palace’s worn boilers with a new energy centre that will save the Queen’s residence 300 tonnes per year in carbon emissions savings.

The ‘Powering the Palace’ clip shows construction workers carving out a new hatch opening for hoisting the decrepit boilers directly out of the basement.

Igoe adds that the new energy centre will also offer the Palace more flexibility for their heating solutions, which will lead to more savings.

The ‘Powering the Palace’ clip shows construction workers carving out a new hatch opening above the basement

The new energy centre will offer the Palace more flexibility for their heating solutions, which will lead to greater savings

The hatch opening lets construction workers hoist the decrepit boilers directly from the basement

Shots of the Palace’s decaying radiators and old boilers are matched only by the dilapidated heating pipes that channel through the building’s floors. 

These 60-year-old pipeworks are double the age of Buckingham’s boilers and are being installed across the many different Palace rooms used for workshops and catering facilities.

While the Palace makeover has attracted some controversy for its eyewatering costs, officials have warned that re-servicing is crucial in order to ‘future-proof’ the building.

Shots of the Palace’s decaying radiators and old boilers are matched by the heating pipes that channel through the building’s floors

These 60-year-old pipeworks are double the age of Buckingham’s boilers, but instead of being replaced in the basement, they are installed in rooms which are used for workshops and catering facilities

Thousands of Royal Collection items are being transferred from The East Wing of the Palace to allow for essential renovations that are due to commence next spring. 

Many items will now go on loan and will be on display in Brighton’s Royal Pavilion, according to the Palace.

However, the Queen will remain in place and it not expected to move out. 

Source: Read Full Article